Where the project started
Each case is framed around the operational challenge rather than only around the equipment delivered.
It helps engineering and maintenance teams recognize similar plant contexts and connect them with retrofit, sector and control-related searches.
Each case is framed around the operational challenge rather than only around the equipment delivered.
Explore combustion, retrofit and ETC control applications. Discuss the requirements and scope of a project for your plant with our team.
The message focuses on reliability, emissions, visibility and stronger engineering governance.
Equipment manufactured for different fuels and industrial processes.

Replacement of the original burner with an IGR burner on a 15 t/h boiler at Heineken.

Green-clad boiler equipped with two burners: one for natural gas and a smaller one for biogas.

Boiler equipped with a FRELSER burner for a hydrogen application.

Combustion assembly for syngas utilization.

Burner for the use of blast furnace gas in a thermal process.
Twin-furnace boiler: replacement of the two original burners with two IGR burners.